Skip to content
Sheet A-304roofing · Monroe Township, NJ40.3195°N 74.4288°WHIC registered work only(732) 532-0178
Applegarth

Our Process

How a roofing job runs in Monroe Township, step by step: the call, the written quote, the work and the final walkthrough — and the less expensive option named when there is one.

Roofing in Monroe Township
02Sequence

Four steps, start to finish

Every chimney, skylight and vent priced on its own line, and a written quote before any work starts.

01

Call with the address

Tell us which community the house is in, whether it is one story or two, and how many skylights and chimneys the roof has.

02

Count the openings, then measure

Every chimney, skylight, vent and pipe boot is counted and looked at, then the roof is measured in squares and the attic checked.

03

A written quote, one line per opening

The squares are one line. Each skylight is its own line, reflash or replace; the chimney is its own line; boots and vents are counted.

04

The work, then the walkaround

Flashing photographed at every opening before it is covered, shingles woven in, photographs before and after.

04Before we arrive

What to do before a roofer arrives, and what to have ready

A few minutes now make the visit shorter and the quote sharper.

01

Catch the water and photograph it

A bucket under the drip, belongings moved, and a few photographs of the stain before anything is touched.

02

Note when it happens

In every rain, only in wind-driven rain, or only after snow.

03

Count the openings

How many skylights, which rooms they are over, and whether the chimney is in use.

04

Ask for every opening on its own line

The repair that stops the water, priced on its own.

05Availability

Storm weeks set the roofing calendar here

Worth knowing before you start calling around, because the busiest weeks are the worst weeks to be deciding a whole roof.

Nor'easters are the storm that turns up in this town's own threads, and the calls they cause arrive together, across the whole township, in the days after one passes. A roof that only needs cover gets it then; a roof that needs replacing does not have to be decided then.

Shingles also need warmth to seal down properly, which is one more reason a replacement arranged for late spring through early fall is a better roof than the same job rushed in February. That is also the time to decide each skylight, with the reflash and replace prices in hand.

  • Active leaks covered the same day where light and weather allow
  • Repairs booked within the week in normal conditions
  • Temporary cover quoted separately from the permanent repair
  • Replacements quoted opening by opening and scheduled ahead
01 —$350-750Est. chimney flashing in Monroe
02 —$200-450Est. skylight reflashing, each
03 —$900-2,200Est. skylight replacement, each
04 —$450-650Est. per square, architectural shingle
01Next step

Want a figure on it?

The estimated range before we travel, and the figure in writing before any work starts.

Call (732) 532-0178